The Patient Room Improvement, Modernization and Enhancement Project (PRIME) is a four story addition and 20,000 square feet renovation of existing spaces. M&S worked with the specifier to include a cutting edge Acorn Controls BASyC digital mixing valve and monitoring system that will maintain the water temperature set point during a power failure at all demand requirements (zero to peak). The BASyC system offers user programable sanitization with email and text alerts to monitor all aspects of your hot water system. This project also features American Standard china fixtures and flush valves which when used together offers a 5 year warranty for both items.